WATER AND WASTEWATER TREATMENT SYSTEMS
COMPREHENSIVE
Activities:
Design and engineering of the treatment system (P&ID, GA drawings, layouts, etc.)
Procurement of main equipment:
Pumps, blowers, filters, membranes, dosing systems, control panels, instruments, etc.
Supply of mechanical, electrical, and instrumentation materials:
Valves, pipes, fittings, cables, junction boxes, etc.
Factory testing (FAT) of major equipment prior to dispatch
Packing, transportation, and delivery to site
Supply of spare parts and consumables for commissioning/start-up
Supply of operating and maintenance manuals
--------------
INSTALLATION
- Site preparation
- Installation of tanks, skid-mounted systems, and equipment supports
- Erection of pumps, blowers, filters, dosing units, and piping systems
- Mechanical connections (flanged, welded, solvent joints)
- Cable laying, tray installation, and electrical terminations
- Installation of control panels, MCCs, and PLC systems
- Mounting and calibration of instruments (pressure gauges, flow meters, level sensors, etc.)
- Hydrotesting and leak testing of pipelines
--------------
COMMISSIONING SCOPE
- Mechanical completion checks, Electrical checks (continuity, insulation resistance, phase verification)
- Instrument calibration and loop testing
- Dry run testing of pumps, motors, and blowers
- Flushing and cleaning of pipelines and tanks
- Verification of interlocks and safety devices
- PLC/SCADA system check and simulation of control logic
- Process fine-tuning and troubleshooting
- Operator training on system operation and maintenance